Bathroom 3
31st May 2008 to 31st August 2008
<-- Index | Showing 1-11 of 11 pictures | Index -->
Part 3 of the sequel...
Tubes for water, heating and electricity
Tubes for water, heating and electricity
600x800
2008-05-18 15:11:18
Placing the drain for the shower
Placing the drain for the shower
800x600
2008-05-31 16:33:26
The floor level needs to be raised about 10 cm, in order to have the shower at the same level as the bathroom
The floor level needs to be raised about 10 cm, in order to have the shower at the same level as the bathroom
600x800
2008-06-07 16:31:21
The shower drain levels with the new floor
The shower drain levels with the new floor
800x600
2008-06-08 12:13:23

800x600
2008-06-08 12:13:52
Preparing to put the
Preparing to put the "kerdi" water proof clothing on the wall
600x800
2008-06-21 18:39:08
sealing the kerdi cloth
sealing the kerdi cloth
600x800
2008-06-25 21:43:59
the first floor tiles
the first floor tiles
600x800
2008-06-28 19:02:39
the shower wall
the shower wall
600x800
2008-08-17 17:36:19
shower wall
shower wall
600x800
2008-08-18 23:49:00
finished the shower wall
finished the shower wall
600x800
2008-08-20 20:58:33